Substrate preparation:
The substrate should be clean, dry, free of dust, dirt, oil, grease, paint residue, and other contaminants (especially release agents) that may prevent the product from adhering properly to the substrate. Immediately before applying the product, porous substrates and absorbent building materials (including brick, concrete blocks, plaster, concrete, wood, and plasterboard) should be lightly moistened with water. This treatment improves adhesion and accelerates the curing of the spray insulation. Smooth and non-absorbent substrates (including metal, glass, and plastics) should not be moistened before application.
Product preparation:
Before use, warm the can of product that is too cold to room temperature (e.g., by immersing it in warm water). Before use, shake the can vigorously (for approximately 30 seconds) to thoroughly mix the ingredients. Screw the hose applicator onto the can. Attach the spray nozzle to the end of the hose applicator and press firmly. The kit comes with two types of spray nozzles mounted on the hose applicator: a straight nozzle and an optional angled nozzle (asymmetrical for insulation, e.g., ceilings).
Foam application:
General recommendations:
Apply the insulation in the upside-down working position. Adjust the spray flow by pressing the hose applicator trigger.
Working with spray insulation:
Always wear safety glasses and gloves when working, and ensure adequate ventilation at the application site. Do not use the product near open flames, heat sources, etc. Apply the foam to the substrate 20-40 cm from the surface. The distance from the substrate determines the width of the application stream; the greater the distance from the substrate, the wider the stream (and therefore the thinner the single-use insulation layer). Immediately after application, the foam increases in volume by 20 to 80% (depending on conditions and the thickness of the sprayed layer). Do not apply a layer thicker than 3 cm at a time; to achieve the target insulation thickness, the product should be applied in layers. After applying each layer, moisten the applied foam and wait approximately 15-20 minutes before applying the next layer. Check that the previously applied layer is not wet from excess moisture and is not sticky. During prolonged application or after a break of more than 15 minutes, shake the can again to mix the ingredients. If the foam flow is uneven, check the cleanliness and unobstructedness of the application nozzle. If the nozzle is clogged, clean the dispensing element. After finishing work and the material has cured, protect the insulation layer from UV radiation (e.g., by covering it with paint or securing it with panels/plasterboard).
| Capacity | 750 ml |
| Packaging type | can |
| Bulk packaging | box 12 pcs |
| Quantity on pallet | 768 pcs. |